Projects

SAT IV

Platform Removal

Mariner Energy (2010)
Saturation operation to remove the upper deck and conductors
Quicklinks

Platform Removal

Petsec Energy Ltd. (2010)
Saturation operation to remove a caisson from platform in Vermillion block of the GOM
Quicklinks

J/U Pride Wyoming Rig Salvage

Seahawk Drilling (2010)
Saturation and surface dive crews salvage drill rig after being destroyed by Hurricane Ike.
Quicklinks
RSS
Slideshow

BP Properties

Wild Well (2009)
Performed Hurricane remediation work on several destroyed platforms
Quicklinks
Slideshow

BP Platform Recovery Project

(2008)
Provided saturation- and surface-supplied diving services for subsea wellhead interventions, platform remediation, and platform removal work.
Quicklinks
Slideshow