Projects

Offshore Diving Operations

El Segundo Mooring

Chevron (2012)
Scheduled maintenance on two offshore product transfer moorings, PLEM (Pipe Line End Manifold)
Curtain Maritime Derrick Barge DB 185-3
Quicklinks
Slideshow

Spartan 151 Jack-up Rig

Furie Operating Alaska (2012)
Divers performed a scour inspection, removed wellhead cap, and installed overshot riser.
tugs boats stand at ready during deployment of Spartan 151 jack-up rig in cool i
Quicklinks
Slideshow

Christy Lee Fender Repair

Hilcorp (2012)
Installed temporary fender, then removed, repaired, and reinstalled original unit.
Installation of temporary system
Quicklinks
Slideshow

USCG - Orphan Well Leaker

US Coast Guard (2011)
Prepare location for lift boat to set up and conduct well abandonment
USCG - Orphan Well Leaker
Quicklinks
Slideshow

Platform Decommissioning

Wild Well Control (2011)
Provided mixed gas diving services to assist with removal of a 8-pile platform jacket
Quicklinks
RSS
Slideshow

Pipeline Abandoment

(2011)
Provided barge and mooring to assist with pipe line abandonment operations, 40 feet from production platform leg and over subsea oil and gas manifold.
Quicklinks

South Timbalier 196 B - Platform Removal

Dynamic Offshore Resources (2011)
Provide surface dive equipment and personnel to facilitate removal of the platform jacket
Platform to be removed from 105 feet of water.
Quicklinks

Attaka Wellhead Plug and Abandonment

Chevron (2011)
Provide SAT divers to assist with permanently abandoning two subsea wells in 220ft of water.
Quicklinks

NuStar Energy SPM Hose Replacement

NuStar Energy (2011)
Assisting with replacment of exisitng hose from PLEM to SPM buoy
NuStar SPM (Sinlge Point Moor)buoy
Quicklinks
Slideshow

Mariner Oil Platform Removal

Wild Well Control, Inc (2011)
Removal of damaged Platform B in block EI 292
Quicklinks
Slideshow

SMI Clean Out

ATP (2010)
Provided saturation diving system and personnel to locate and remove a paraffin blockage in oil flow line
Quicklinks

Anaconda Mat Installation

Cal Dive / Enterprise (2010)
Installation of post mats on the Anaconda natural gas pipeline crossings
Quicklinks
Slideshow