Projects

Dive Control Vans

North Area Dive Bundle

PG&E (2012)
Execution of three unique marine construction projects combined into one contract.
Dive barge moored to intake tower
Quicklinks
Slideshow

El Segundo Mooring

Chevron (2012)
Scheduled maintenance on two offshore product transfer moorings, PLEM (Pipe Line End Manifold)
Curtain Maritime Derrick Barge DB 185-3
Quicklinks
Slideshow

WTP#4 - Raw Water Intake

City of Austin (2012)
Provided diving services to assist with the installation of new raw water intake piping in Lake Travis.
Quicklinks
Slideshow

Pit 5 Stem Guide Protection

Pacific Gas & Electric (2011)
Stem guide protection welded onto face of bulkheads.
Lowering Stem Guide Protection
Quicklinks
Slideshow

USCG - Orphan Well Leaker

US Coast Guard (2011)
Prepare location for lift boat to set up and conduct well abandonment
USCG - Orphan Well Leaker
Quicklinks
Slideshow

Canyon Ferry Stoplog Guide Removal

US Department of Interior - Bureau of Reclamation (2011)
Providing project management and diving services to remove existing stoplog guides from face of dam
dive barge, canyon ferry dam, stoplog guide removal project
Quicklinks

Relief Reservoir

Pacific Gas & Electric (PG&E) (2011)
High altitude diving to install blind flanges on upstream end of dam outlet works
heavly lift helicopter, mobilizing to remote job site, diving at altitude
Quicklinks
Slideshow
Video

Platform Decommissioning

Wild Well Control (2011)
Provided mixed gas diving services to assist with removal of a 8-pile platform jacket
Quicklinks
RSS
Slideshow

Pipeline Abandoment

(2011)
Provided barge and mooring to assist with pipe line abandonment operations, 40 feet from production platform leg and over subsea oil and gas manifold.
Quicklinks

Dix Dam Face Slab Repair

Kentucky Utilities Company (2011)
Contract for debris removal and maintenance on and around the face slab.
Dix Dam Face Slab Repair
Quicklinks
Slideshow

South Timbalier 196 B - Platform Removal

Dynamic Offshore Resources (2011)
Provide surface dive equipment and personnel to facilitate removal of the platform jacket
Platform to be removed from 105 feet of water.
Quicklinks